CinchOps managed IT services and cybersecurity Houston Texas
  • Services
    • Managed IT Services
    • Cybersecurity
    • Business Continuity & Disaster Recovery (BCDR)
    • Virtual CTO & CIO Services
    • Cloud Services
    • Software Defined Wide Area Networks (SD-WAN)
    • Voice Over IP (VoIP)
    • Business Process Automation
  • Industries
    • By Company Size
      • Small & Midsize Businesses
      • Enterprise
    • Construction
    • CPA Firms
    • Energy Services & Utilities
    • Engineering
    • Law Firms
    • Manufacturing
    • Oil & Gas Services
    • Wealth Management
  • Local to You
    • Brookshire
    • Cypress
    • Fulshear
    • Houston
    • Katy
    • Missouri City
    • Richmond
    • Rosenberg
    • Sealy
    • Sugar Land
    • The Woodlands
    • Tomball
  • Reviews
  • Resources
    • IT Scorecards
    • IT Outage Calculator
    • Blog
    • News & Updates
    • Videos
    • FAQs
    • CinchOps CyberJeopardy
  • Research
    • Houston Area Security Index
    • Houston Area Patch Index
    • Houston MSP Review Index
    • Houston Growth Index
    • Houston Vulnerability Index
    • Cybersecurity by the Numbers
  • About Us
    • Our Story
    • Your Story
    • My Story
  • Contact
I Need IT Support Now
Flat illustration of an electric meter on an office wall with transmission towers outside the window, a backup power unit and a cloud connection
Shane Stevens
Shane Stevens September 28th, 2026

CenterPoint $50 Million Grant: What It Means for Houston Businesses

Transmission Upgrades And Neighborhood Power Lines In Houston – CenterPoint’s Grid Upgrade And Your Office Outage Plan

Houston Grid Alert
CenterPoint's $50 Million Grid Grant Is Real Money for Houston. Your Office Still Needs Its Own Outage Plan.

What Project TALON changes on the Houston grid, what it leaves alone, and what a 10 to 200 person business should keep budgeting for.

TL;DR
The Department of Energy selected CenterPoint on September 24, 2026 for $50 million toward Project TALON, a $176.7 million transmission stabilization project for Greater Houston. It targets capacity and stability under heavy load, not wind and tree damage on neighborhood lines, so Houston businesses should keep their outage plans funded.
📊 What TALON Is 🌀 What Beryl Broke 🔌 Your Outage Plan 🚀 How CinchOps Helps

The CenterPoint $50 million grant announced on September 24, 2026 pays for one piece of equipment on Houston's transmission system. It will not change what happens at your office the next time high winds drop trees across the power lines on your street.

If you run a 10 to 200 person business in Houston, Katy or Sugar Land, you may still have a generator quote or a UPS upgrade on your desk from the summer of Hurricane Beryl. This week's headline makes it tempting to shelve that spending. The federal paperwork behind the headline says you shouldn't.

CinchOps builds power-outage continuity plans for Houston professional firms, engineering offices and energy-sector businesses of 10 to 200 employees, with immutable backups kept geo-redundant outside the Gulf Coast flood zone and a help desk that answers in under 15 minutes. We read the DOE selection list, CenterPoint's release and the Texas PUC's Beryl investigation side by side. The gap between what the grant funds and what failed in 2024 is the whole story for a small business owner.

THE SHORT VERSIONWhat the Grant Covers and What It Leaves to YouCenterPoint Project TALON, selected by DOE on September 24, 2026WHAT THE $50M GRANT CHANGESTransmission stabilitySteadier power when demand swingsMore grid capacityRoom for a fast-growing regionA substation build500+ local jobs, per CenterPointWHAT IT LEAVES TO YOUNeighborhood linesWhere Beryl's tree damage hitPower at your officeUPS runtime and a generator decisionStaying reachableInternet failover, cloud phones, backupsCinchOps · cinchops.com
The short version: Project TALON is a capacity and stability project for a growing region. Treat it as good long-term news for Houston's power supply, and keep your own business continuity plan funded as if the grid you had during Beryl is the grid you will have next summer.

Project TALON Is One Transmission Device, Selected but Not Yet Signed

What the Department of Energy actually chose to fund in Houston, and where the money stands.

Project TALON, short for Transmission Area Load Optimization Node, is a CenterPoint Energy Houston Electric project that would install an advanced transmission system stabilization device, letting the Greater Houston grid respond quickly to power fluctuations and carry more load reliably, according to the Department of Energy's September 2026 selection list.

The award came through DOE's SPARK program, run by the Office of Electricity. SPARK picked 31 projects in 26 states worth $5.25 billion in total: $1.9 billion in federal money and $3.35 billion in cost share from the recipients. DOE's list puts Project TALON at $50 million in federal funds against a total project value of $176,694,221. That leaves roughly $126.7 million coming from somewhere other than the federal grant.

PROJECT TALONWhat the Houston Grid Award Actually IsDOE SPARK selection, announced September 24, 2026$50MFederal share DOE selected for TALONFinal terms still in negotiation$176.7MTotal project value on DOE's listAbout $126.7M from non-federal funds1 of 31SPARK selections based in TexasHouston is the only Texas prime location2.9MCenterPoint customers in Greater HoustonPer CenterPoint's September 24 releaseCinchOps · cinchops.com

CenterPoint's own release names the hardware as Siemens Energy transmission grid stabilizing technology and says CenterPoint will be one of the first U.S. utilities to install it. The company expects more than 500 local jobs during construction and installation. That job count is a signal about scale: this is a substation build, not a software switch.

Two details matter for timing. CenterPoint's release says the award follows finalization of negotiations with DOE, and DOE's list says project details are subject to change until the financial assistance agreements are final. Neither document gives an in-service date. We also counted the prime locations on DOE's list: Houston is the only one of the 31 selections based in Texas.

The Beryl Fixes Texas Regulators Asked For Sit on Neighborhood Lines, Where TALON Does Not Reach

Why a transmission upgrade and a hurricane-hardening program solve different problems.

Project TALON targets power fluctuations and heavy loading on Houston's transmission system, while the Public Utility Commission of Texas traced most of Hurricane Beryl's tree-related outages to trees outside utility easements falling on local lines. The two problems sit at different layers of the grid, so the grant does not close the gap Beryl exposed.

Beryl came ashore in July 2024 as a Category 1 hurricane. The PUC's November 2024 investigation lists it at 80 mph winds with 97 mph gusts, and it still disrupted service for 2.7 million Texas customers, 2.2 million of them on CenterPoint's system. The PUC says Beryl knocked out power for roughly 90% of CenterPoint's customers.

GRID TO YOUR DESKWhere TALON Sits Between the Grid and Your Office1GenerationPower plantsdispatched by ERCOTOutside this award2TransmissionHigh-voltage linesand substationsTALON installs here3DistributionNeighborhood linesand polesBeryl's tree damage4Your MeterWhere the utility'sresponsibility endsHand-off point5Your OfficeUPS, generator,failover, cloud phonesYour plan covers thisWHAT TALON TARGETSPower fluctuations and high loading onthe transmission system (DOE narrative)WHAT BERYL EXPOSEDTrees outside easements on local lines;PUC urged covered conductor, reclosersCinchOps · cinchops.com

The commission's recommendations read like a distribution checklist: clear trees beyond the easement, consider covered conductor on distribution lines in heavily wooded areas, add circuit reclosers so crews can isolate faults faster, and right-size the mobile generation fleet. Transmission did take hits. The same report notes ERCOT logged damage to a little over 100 transmission circuits on July 8, 2024, and the May 2024 derecho damaged at least 14 transmission lines, mostly in CenterPoint territory. DOE's description of TALON still says nothing about wind, trees or storms. It describes a device that keeps a growing system stable when demand swings.

That makes sense for a region CenterPoint calls one of the fastest growing in Texas and the nation. For the owner of a Cypress engineering office or a Katy CPA practice, though, the failure that matters is the line on your street, and nothing in this award is aimed at that line.

Houston Businesses Should Plan Outages Around the Grid They Have Today

YOUR OUTAGE PLANWhat a Houston Office Keeps FundedThe side of the meter no grid grant reachesUPS Runtime Written DownClean shutdown for servers, firewall, switchesGenerator DecisionWhich circuits, fuel on hand, who starts itInternet FailoverCellular link on a second path via SD-WANCloud-Hosted PhonesMain line forwards to cell phonesOffsite Immutable BackupsKept outside the Gulf Coast flood zoneRemote Access TestedChecked from home in the springCinchOps · cinchops.com

What to keep funding while the federal project works its way through negotiation and construction.

A power-outage continuity plan is the set of equipment, services and written steps that keeps a business answering phones, reaching its data and protecting its hardware while utility power is out for hours or days. For a Houston office, that plan should assume the same grid that went dark during Beryl.

Project TALON has no published in-service date and a negotiation still ahead of it. Your next hurricane season does have a date. Budget for it.

In 35+ years doing this, I've watched the same mistake repeat after every major outage: a business waits on somebody else's infrastructure schedule, and the waiting becomes the plan. Here is what a 10 to 200 person office in Houston, Katy or The Woodlands should keep on the list:

  • UPS units sized to give servers, firewalls and switches a clean shutdown, with the runtime written down so nobody guesses during the outage.
  • A generator decision made in writing, covering which circuits it feeds, how much fuel is on hand and who is allowed to start it.
  • Internet failover over a different physical path, such as a cellular link managed through SD-WAN, so a dead cable modem does not take the office offline.
  • Cloud-hosted VoIP phones that forward the main line to cell phones when the building is dark.
  • Immutable backups kept geo-redundant outside the Gulf Coast flood zone, so a hurricane that closes the office does not also take the data.
  • Remote access tested from employees' homes in the spring, before anyone depends on it.

None of that competes with the grid upgrade. A stronger transmission system lowers one kind of risk for the whole region. The list above covers the risk that lands on your side of the meter.

Federal money for Houston's grid is good news, and I hope TALON performs exactly as designed. It still sits miles upstream of your office. When a tree comes down across your street, the only plan that keeps your phones ringing is the one your business paid for.
Shane Stevens, CEO, CinchOps - LinkedIn

Build an Outage Plan That Doesn't Wait on the Utility

CinchOps' business continuity and disaster recovery service maps what has to keep running, sets up internet failover and cloud phones, and keeps immutable backups geo-redundant outside the Gulf Coast flood zone.

Review your outage plan with CinchOps →

How CinchOps Can Help Houston Businesses Plan for Grid Outages

CinchOps is a managed IT services provider based in Katy, Texas, serving small and mid-sized businesses across the Houston metro area. CinchOps specializes in cybersecurity, network security, managed IT support, VoIP, and SD-WAN for businesses with 10 to 200 employees.

  • Through business continuity and disaster recovery, CinchOps maps which systems must stay up during a multi-day outage and keeps immutable, verified backups outside the Gulf Coast flood zone.
  • With SD-WAN and cloud VoIP, offices keep internet and phone service on a second path when the primary circuit fails.
  • Through managed IT support, a named engineer who knows your network handles UPS sizing, shutdown order and restart checks, with help desk calls answered in under 15 minutes.
  • CinchOps supports businesses across Houston, Katy, Cypress and Sugar Land.
  • Outage planning is built around the realities of energy and utilities firms, engineering firms, law firms and CPA firms, where a lost day means missed filings and deadlines.

Project TALON is a good bet on Houston's growth, and it deserves to be built. Your business can't wait on it. If the generator quote from 2024 is still sitting on your desk, talk to CinchOps before next summer, not in the week after a hurricane.

100% Free

Know Your Business Security Score

Get a FREE comprehensive security assessment for your Houston area business. Understand vulnerabilities across your network, applications, DNS, and more.

Get Your Free Assessment

Frequently Asked Questions

What is CenterPoint's $50 million DOE grant for?

The Department of Energy selected CenterPoint Energy Houston Electric on September 24, 2026 for $50 million toward Project TALON. The $176.7 million project would install an advanced transmission system stabilization device, which CenterPoint says is Siemens Energy technology, to help the Greater Houston grid handle power fluctuations and heavy load.

Will the CenterPoint grant reduce power outages at my Houston office?

Probably not the storm outages Houston businesses remember. Project TALON targets stability and capacity on the transmission system. The PUC traced most of Hurricane Beryl's tree-related outages to trees outside utility easements falling on local lines, a distribution problem this award does not address. Keep your own outage plan funded.

When will Project TALON be finished?

Neither DOE nor CenterPoint has published an in-service date. CenterPoint's September 24, 2026 release says the award follows finalization of negotiations with DOE, and DOE says project details may change until agreements are final. Houston businesses should plan for next hurricane season without counting on the new device.

What is business continuity in IT?

Business continuity in IT is the planning and equipment that keep a company's phones, data and applications available during a disruption such as a multi-day power outage. For Houston offices, it usually covers UPS and generator decisions, internet failover, cloud phones, remote access and backups kept outside the Gulf Coast flood zone.

What does power outage continuity planning cost in Houston?

CinchOps prices managed IT at a flat monthly rate per user, from $100 to $250 per user per month, with no long-term contracts, no hidden fees and no cancellation penalties. Backup and recovery are included in the top-tier plan. Hardware such as UPS units or a generator is quoted separately.

Discover More

Houston Business Alert: Texas Power Grid Faces Increased Winter Blackout Risk as Data Center Demand Surges
Managed IT Houston: What the Data Center Power Squeeze Means
7 Steps for a Smart Business Continuity Checklist for Houston Businesses
What Is Business Continuity and Why Houston SMBs Need It
World Backup Day 2026: Why Houston Businesses Can't Afford to Skip Data Backups
Distributed Energy Resources and Microgrids: The Growing Cybersecurity Threat Houston Businesses Must Address

Resource

Infographic: CenterPoint's $50 million grid grant funds upstream transmission through Project TALON, part of a $176.7 million project, while 90% of CenterPoint customers, 2.2 million, lost power in Hurricane Beryl on neighborhood lines - the five grid layers from generation to your office and six things a Houston office should keep funded
CenterPoint's $50 Million Grid Grant: What It Covers for Houston Businesses, and What It Leaves to You Open Full Size

Sources

  • CenterPoint Energy - CenterPoint Energy Selected to Receive $50 Million U.S. Department of Energy Grant, September 24, 2026
  • U.S. Department of Energy, Office of Electricity - Speed to Power through Accelerated Reconductoring and other Key Advanced Transmission Technology Upgrades (SPARK)
  • Houston Chronicle - CenterPoint lands $50M in federal funds for Houston grid fix, September 2026
  • Public Utility Commission of Texas - Investigation of Emergency Preparedness and Response by Utilities in Houston and Surrounding Communities, Project No. 56822, November 2024
  • U.S. Department of Energy - Selected Applications for DE-FOA-0003580 (SPARK), September 2026
  • KPRC 2 Click2Houston - Federal grid funding coming to Texas as DOE, CenterPoint Energy hold joint Houston announcement, September 24, 2026
Shane Stevens, founder and CEO of CinchOps
About the Author

Shane Stevens

Shane Stevens is the founder and CEO of CinchOps, a managed IT and cybersecurity provider for small and mid-sized businesses across the Greater Houston area, including Katy. He brings more than 35 years of IT experience, including director, VP, and CTO roles at Tidal Software, Cisco, ABB, Delinea, Digital.ai, and NinjaOne, to keeping local businesses secure, efficient, and productive.

Read Shane’s story·Connect on LinkedIn

BLOG

Latest News & Articles

April 28th, 2026
Managed IT Houston
Cloud Services for Houston Businesses: Migration, Cost Control, and the FinOps Playbook

What To Inventory Before Your First Cloud Contract – How Houston Businesses Choose Between Public, Private, And Hybrid Cloud

March 18th, 2026
GlassWorm
GlassWorm Malware Hits 400+ Code Repos with Invisible Payloads

Supply Chain Attack Uses Blockchain For Persistent Command And Control – Open Source Dependencies Create Hidden Risk For Non-Technical Businesses

May 13th, 2026
Cybersecurity Katy
How to Secure Remote Work: Proven Steps for Texas Businesses

The Office Left the Building. Your Security Strategy Needs To Catch Up – Home Office. Coffee Shop. Construction Site. Every Device Is a Door

July 21st, 2026
Managed IT cost for Houston CPA firms
How Much Does Managed IT Cost for a CPA Firm? (2026 Pricing Guide)

Budgeting Technology For An Accounting Practice – Cost By Firm Size, From 10 Users To 100

August 20th, 2025
Managed Service Provider Houston Process Automation
CinchOps Streamlines Houston Business Tasks With Automation

From Manual To Automated: Your Houston Business Transformation – Transform Your Houston Business With Smart Process Automation

Take Your IT to the Next Level!

Book A Consultation for a Free Managed IT Quote

BOOK A FREE CONSULTATION
281-269-6506
CinchOps managed IT services and cybersecurity Houston Texas
  • Home
  • Our Story
  • Reviews
  • FAQs
  • Contact
  • Sitemap
Contact info
  • 281-269-6506
  • info@cinchops.com
  • 2717 Commercial Center Blvd.
    Suite E200
    Katy, Texas, 77494

Services
  • Managed IT Services
  • Cybersecurity
  • Virtual CTO & CIO
  • Business Continuity & Disaster Recovery
  • Cloud Services
  • Business Process Automation
Service Areas
  • Brookshire
  • Cypress
  • Fulshear
  • Houston
  • Katy
  • Missouri City
  • Richmond
  • Rosenberg
  • Sealy
  • Sugar Land
  • The Woodlands
  • Tomball
©2026 CinchOps, LLC. All Rights Reserved.  | Privacy Policy